Projects

Solutions in Practice

Monarflex Štúrovo

Krasňany Depot

Ludrová Agricultural Cooperative

ŠZŠ Brezno – Special Primary School

The project included the removal of the existing electrical installation and the subsequent implementation of a new technical solution, including new electrical installations, installation of luminaires and a lightning protection system. The result was a comprehensive refurbishment of the building’s electrical systems, with a focus on safety, reliability and dependable operation.

Poľnonákup Liptovský Mikuláš

Agropark Beňadiková

Kremnica Detention Centre

Dormitory Reconstruction – Liptovský Hrádok

The project includes the preparation of design documentation, supply and installation of Voice Alarm (VAS) and Fire Detection and Alarm (FDAS) systems as part of the refurbishment and conversion of the former dormitory into a mixed-use building. The scope also includes material supply, installation works, system commissioning, inspections and testing, as well as related design activities in accordance with the building permit documentation.

Status: IN PROGRESS

D2 – Rohožník Interchange

Scroll to Top